Quantitative Aptitude Quiz for SSC(Time and Work): 1 April 2021

Updated Thu, 01 Apr 2021 02:01 PM IST

1. X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?

Source: safalta.com



a) 25 days
b) 20 days
c) 15 days
d) 10 days



2.A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days?

a) 9 days
b) 11 days
c) 13 days
d) 15 days

3. Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?

Free Demo Classes

Register here for Free Demo Classes



a) 8 hours 15 minutes
b) 8 hours 30 minutes
c) 8 hours 45 minutes
d) 8 hours 20 minutes

4. A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in:

a) 2 (2/7) days
b) 3 (3/7) days
c) 5 (5/7) days
d) 4 (4/7) days

 
5. Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is

a) 16 days
b) 20 days
c) 12 days
d) 18 days

6. A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in

a) 4 days
b) 6 days
c) 8 days
d) 12 days

7. A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in

a) 8 days
b) 10 days
c) 12 days
d) 16 days

8. A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work?

a) 16 days
b) 18 days
c) 24 days
d) 20 days

9. A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in

a) 4 days
b) 6 days
c) 8 days
d) 12 days


10. Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman?

a) 5 : 3
b) 3 : 5
c) 4 : 3
d) 3 : 4

 

Related Article

DHSE Kerala Plus Two, Class 11 Model Exam Time Table 2025 released, Check the exam schedule here

Read More

Maharashtra RTE Admission: 25% आरक्षित सीटों पर महाराष्ट्र आरटीई के लिए आवेदन शुरू, जानें पात्रता मानदंड

Read More

SBI PO Job 2024: एसबीआई में पीओ के 600 पदों पर आवेदन की अंतिम तिथि बेहद नजदीक, जल्द करें इस लिंक से पंजीकरण

Read More

UKPSC RO, ARO Prelims Exam: यूकेपीएससी आरओ, एआरओ प्रारंभिक परीक्षा हुई रद्द, अब इस डेट में होगा एग्जाम

Read More

RRB NTPC Exam 2024: कब जारी होगी आरआरबी एनटीपीसी परीक्षा की तारीख? जानें परीक्षा से जुड़े नए अपडेट्स

Read More

GATE 2025 Admit Card: गेट परीक्षा के लिए प्रवेश पत्र हुए जारी, यहां से करें डाउनलोड; फरवरी में होंगे एग्जाम्स

Read More

JAC Jharkhand board 10th-12th model papers 2025 out; Read the steps to download pdf here

Read More

RRB ALP Result 2024: लोको पायलट सीबीटी-1 का रिजल्ट कब होगा जारी? जानें चयन प्रक्रिया और टाई-ब्रेकिंग नियम

Read More

MP Metro Rail Recruitment 2025: Registration window for various posts open now; Salary Up to 1.45 Lakh, Read here

Read More